Update on Shooting Music Video - Production Schedules/Overview

The shooting of the first draft has nearly been completed. I have filmed the footage on three separate days, the first being at Lutterworth College in the AVS Studio and the other two during the half term at Whistle Way and Scare Farm.
(The AVS Studio Production Schedule):
(Click to Enlarge)
The AVS Shoot went really well. I was very impressed with how quickly Joe managed to pick up the lip-syncing (which was helped by him knowing the lyrics so well). The Artificial Lighting used allowed a shadow to be picked out behind him because the light was angled upright below him.

(The Whistle Way Production Schedule):
(Click to Enlarge)
The second day of filming was during the half term and I was surprised on how little disturbance we actually got from passersby and so the overall film went quite smoothly. The only thing that may be an issue is that the wind was fairly strong and could be shown in the footage.
(The Scare Farm Production Schedule):
(Click to Enlarge)
Finally, the last day of filming for the first draft was at Scare Farm. Because most of the footage had been shot previously, this location was mainly for the setting and establishing shots for each verse to create the overall atmosphere. I’m confident that the shots that I took worked for the mood that I wanted to create (by the idea of him being alone – using the extreme long shots and shots of him walking away from the camera).



I will post some shot sequences in progress shortly as now the post-production stage begins; editing!